Titan Controls® Helios® 6 - 8 Light 240V Controller with Dual Trigger Cords

Part #{{activeImage.ParentId}}
Titan Controls® Helios® 6 - 8 Light 240V Controller with Dual Trigger Cords
Part #{{activeImage.ParentId}} Download Image
Titan Controls® Helios® 6 - 8 Light 240V Controller with Dual Trigger Cords
This controller will run eight (8) HID lights at 240 volts. The only lighting controllers featuring two (2) industrial-grade ballast rated relays. Plug relay trigger cord set into 24 hour wall timer. Removable front panel makes controller easy to wire into your power system. Durable powder-coated steel enclosure. 50 Amps input power/40 Amps output power/240 Volts/60Hz/8000 watts. Patent No. D660,252.

  • The Helios 6 operates up to eight 1000 Watt HID lights at the same time
  • US and Canadian ETL listed for use in commercial applications
  • The only lighting controllers featuring industrial-grade Allen Bradley ballast rated relays
  • Step by step installation instructions are easy to follow
  • Dual 120 volt trigger cords allow the operator to stagger lights or run two separate lighting schedules
  • UL listed NEMA 6-15 outlets
  • Durable powder coated steel chassis
  • 50 Amps/ 240 Volt = Input power
  • 40 Amps/ 240 Volt = Output power
  • Patent Pending - 29/511,532
  • 60 Hz.
  • Hand built in the USA!
  • 3 year warranty
702672 - Titan Controls Helios 6 - 8 Light 240 Volt Controller w/ Dual Trigger Cords
Download Application Diagram (PDF Document)
Download Instructions (PDF Document)
702672 - Titan Controls Helios 6 - 8 Light 240 Volt Controller w/ Dual Trigger Cords
  EACH CASE PALLET
Upc: 847127000304 847127000304
Quantity: 4
Volume (cf): 0.831 3.5982
Dim Weight (in3/lb): 7.4029 32.0503
Weight (lb): 11.8 49.60
Length (in): 16.5 27.50
Width (in): 13.6 17.00
Height (in): 6.4 13.30
What is the 'trigger cord' for?
The 'trigger cord' activates and deactivates your light bank. It uses a standard 120 Volt circuit to open and close the high power relay inside the Helios 4 lighting controller. When the trigger cord activates the relay, you will hear a 'thunk' sound. This is the relay turning ON your light bank. When the trigger cord defeats the 120 Volt power to the relay, you will hear the 'thunk' sound again and your lights will be OFF. To operate your light bank, plug the 'trigger cord' into a 120 Volt 24 hour appliance timer (we suggest Apollo 6 or Apollo 7 120V timers) and set your required lighting schedule (normally 18 hours in vegatative stage and 12 hours in flowering stage). Your grow lights will operate based on the ON/OFF settings on the 24 hour timer. See application diagram for more information.

    Sort By:
   Brand:
    Category:
Sorry No Results Found...
Title MSRP Wish List
{{part.PartId}}
{{part.PartId}}
{{part.Name}}
{{part.Name}}
{{part.Message}}
NEW
{{Sunlight.Web.Utility.GetFormattedPrice(part.EachMsrp)}}
 Wish List
 Find Retailer
Your results were limited to 50 items. You may want to be more specific.